Modeling Permanent Faults,d at structural level, became mandatory to constrain design quality and costs. However, as product complexity increases, the test process (including test planning, DfT and test preparation) needs to be concurrently carried out with the design process, as early as possible during the top-down phase,
32#
發(fā)表于 2025-3-27 04:43:29 | 只看該作者
33#
發(fā)表于 2025-3-27 09:03:56 | 只看該作者
34#
發(fā)表于 2025-3-27 13:05:40 | 只看該作者
Test Generation: A Hierarchical Approach,y, on the other hand, is usually considered only when the detailed structural information of the design is available. This is mainly due to the lack of general applicability of the existing high-level test generation and design-for-test methods. In this chapter we will present an improvement of the
35#
發(fā)表于 2025-3-27 14:02:16 | 只看該作者
Test Program Generation from High-level Microprocessor Descriptions,ing from early design phases. The methodology is based on an almost automatic tool and could be applied to generate test-programs for stand-alone microprocessor cores as well as for these embedded in systems-on-chip. The main idea is to take advantage of all possible microprocessor descriptions deli
36#
發(fā)表于 2025-3-27 21:46:12 | 只看該作者
Tackling Concurrency and Timing Problems,ic execution. A concurrent system can perform many different correct computations for a given input sequence because the absolute order of execution is dependent on factors which cannot be known at design/compile time. Synchronization constructs are used to restrict the set of possible computations
37#
發(fā)表于 2025-3-28 01:08:53 | 只看該作者
An Approach to System-level Design for Test,h, where the test set is assembled from pseudorandom test patterns that are generated online and deterministic test patterns that are generated offline and stored in the system. We have analyzed the aspects related to the cost calculation of such a hybrid BIST approach and will propose a test cost m
38#
發(fā)表于 2025-3-28 04:40:58 | 只看該作者
System-level Dependability Analysis, which is made up of several .. We assume that the components, which may be designed with the support of hardware—software codesign tools, are characterized by dependability (. failure rate) parameters, which may derive from simulators of the components while they are under development, or as a resu
39#
發(fā)表于 2025-3-28 06:47:53 | 只看該作者
Book 2005 (SOC), together with its associated manufacturing problems, represents a real challenge for designers...SOC is also reshaping approaches to test and validation activities. These are beginning to migrate from the traditional register-transfer or gate levels of abstraction to the system level. Until
40#
發(fā)表于 2025-3-28 12:47:11 | 只看該作者
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點(diǎn)評(píng) 投稿經(jīng)驗(yàn)總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2026-1-20 11:11
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
巴林右旗| 广州市| 六盘水市| 申扎县| 晋州市| 迁安市| 佛学| 班戈县| 丹阳市| 青神县| 铜梁县| 枞阳县| 阜城县| 奉节县| 通化县| 石嘴山市| 泾阳县| 阿城市| 庄河市| 聂荣县| 唐山市| 寿宁县| 三穗县| 南通市| 绥中县| 呈贡县| 尚义县| 望城县| 鹿泉市| 黄骅市| 浦东新区| 灯塔市| 交城县| 慈溪市| 宁乡县| 岳池县| 汾西县| 古田县| 武陟县| 长宁县| 福海县|