找回密碼
 To register

QQ登錄

只需一步,快速開始

掃一掃,訪問微社區(qū)

打印 上一主題 下一主題

Titlebook: How Megaprojects Are Damaging Nigeria and How to Fix It; A Practical Guide to Jimoh Ibrahim,Christoph Loch,Kishore Sengupta Book‘‘‘‘‘‘‘‘ 20

[復(fù)制鏈接]
樓主: 夸大
31#
發(fā)表于 2025-3-26 23:33:15 | 只看該作者
Jimoh Ibrahim,Christoph Loch,Kishore Senguptamote and mysterious to many scientists as they are to most laymen. This book endeavours to remedy the situation: an attempt has been made to provide, in readily comprehensible form, a nucleus of information essential to anyone embarking on the study of bacteriophages or using them in their work for
32#
發(fā)表于 2025-3-27 03:44:51 | 只看該作者
33#
發(fā)表于 2025-3-27 08:13:14 | 只看該作者
34#
發(fā)表于 2025-3-27 10:47:12 | 只看該作者
Introduction: The Project Abandonment Problem,y large projects did not just “fail” but were abandoned, leaving ruins behind. Nigeria has no systematic data on what has been spent, but the sums are clearly huge—the 38 projects alone that this investigation considers in detail represent a total budget of over $25B, almost equalling Nigeria’s tota
35#
發(fā)表于 2025-3-27 14:42:36 | 只看該作者
What We Know About the Management of Very Large Projects, and one can get them wrong in a hundred different ways. So existing frameworks contain many success variables. This study is based on this knowledge—it is unlikely that in the Nigerian context, forces are at work which have never been observed anywhere else before. But not all the influence factors
36#
發(fā)表于 2025-3-27 20:51:57 | 只看該作者
Structure of the Investigation,people involved in each of 38 projects (19 abandoned, and 19 completed). The projects are matched by sector and size to allow comparisons, and three respondents per project reduce biases..While quantitative data allows “objective” statistical analysis, 11 of the projects were in addition described i
37#
發(fā)表于 2025-3-28 01:45:14 | 只看該作者
Insights from the Analysis of the Questionnaires,rst compresses the 41 questionnaire variables (which contain duplication for robustness sake) into 5 success factors. Then, regressions identify which success factors drive the probability of project completion and which factors drive budget and schedule overruns (for the completed projects)..The ec
38#
發(fā)表于 2025-3-28 03:36:15 | 只看該作者
39#
發(fā)表于 2025-3-28 09:17:15 | 只看該作者
Two Bridge Projects,od business cases. But the Second Niger Bridge became a pawn of political promises, had insufficient financial assurances and then was stalled after a government change. The Third Mainland Bridge had also been stalled and was rescued by the (military) President for idiosyncratic reasons, but then ru
40#
發(fā)表于 2025-3-28 11:48:31 | 只看該作者
Two Power Plants,t supported the project (which had a strong value proposition) and saw it through..The second project, the Calabar Power Plant, was a part of a large highly ambitious scheme to build 11 power plants, which ran out of money as well as neglecting critical components of the network surrounding a plant
 關(guān)于派博傳思  派博傳思旗下網(wǎng)站  友情鏈接
派博傳思介紹 公司地理位置 論文服務(wù)流程 影響因子官網(wǎng) 吾愛論文網(wǎng) 大講堂 北京大學(xué) Oxford Uni. Harvard Uni.
發(fā)展歷史沿革 期刊點評 投稿經(jīng)驗總結(jié) SCIENCEGARD IMPACTFACTOR 派博系數(shù) 清華大學(xué) Yale Uni. Stanford Uni.
QQ|Archiver|手機(jī)版|小黑屋| 派博傳思國際 ( 京公網(wǎng)安備110108008328) GMT+8, 2025-10-7 11:15
Copyright © 2001-2015 派博傳思   京公網(wǎng)安備110108008328 版權(quán)所有 All rights reserved
快速回復(fù) 返回頂部 返回列表
大石桥市| 揭阳市| 白朗县| 徐州市| 诸城市| 拜城县| 新田县| 永安市| 都匀市| 阿拉善左旗| 托克逊县| 屏山县| 通城县| 怀安县| 漳浦县| 仁寿县| 专栏| 磐安县| 富顺县| 贵南县| 嫩江县| 龙南县| 溆浦县| 修水县| 深圳市| 灌阳县| 台南市| 孟连| 广丰县| 西丰县| 错那县| 瓮安县| 定安县| 高台县| 留坝县| 绥德县| 美姑县| 思南县| 防城港市| 榕江县| 鲁山县|