派博傳思國際中心

標題: Titlebook: ; [打印本頁]

作者: CLIP    時間: 2025-3-21 18:27
書目名稱Green Energy Audit of Buildings影響因子(影響力)




書目名稱Green Energy Audit of Buildings影響因子(影響力)學科排名




書目名稱Green Energy Audit of Buildings網(wǎng)絡公開度




書目名稱Green Energy Audit of Buildings網(wǎng)絡公開度學科排名




書目名稱Green Energy Audit of Buildings被引頻次




書目名稱Green Energy Audit of Buildings被引頻次學科排名




書目名稱Green Energy Audit of Buildings年度引用




書目名稱Green Energy Audit of Buildings年度引用學科排名




書目名稱Green Energy Audit of Buildings讀者反饋




書目名稱Green Energy Audit of Buildings讀者反饋學科排名





作者: muffler    時間: 2025-3-21 21:13
Green Energy Audit: General Aspectst make the process convenient, without ignoring the critical issues that may emerge from its incorrect application. The chapter explores the three operational levels of walkthrough audit, standard audit and simulation audit, highlighting the differences between the different approaches. Organisation
作者: 六邊形    時間: 2025-3-22 01:52

作者: needle    時間: 2025-3-22 06:26
Acquisition of Basic Informationdocumentation and administrative documentation that the client provides. This chapter has the objective of providing criteria and methods to effectively manage, in an orderly and efficient manner, this phase which, although preliminary, is nonetheless strategic. In order to support this phase, a set
作者: mitten    時間: 2025-3-22 09:13
Survey Instrumentation and Methodsbut at the same time is an important opportunity to acquire information on the management procedures. The proper use of the survey instrumentation is fundamental at this stage. In the first part of the chapter, survey instruments required for the Green Energy Audit are selected and described with th
作者: Serenity    時間: 2025-3-22 16:22
Infrared Auditmography in the energy fields are very widespread, since through such an investigation, which is non-invasive, and a correct interpretation of infrared images, it is possible to highlight inefficiencies on buildings and facilities. This chapter describes the application of infrared audits in support
作者: Serenity    時間: 2025-3-22 20:50
Evaluation of the Performance Improvemention improved, i.e., that which is achieved after the retrofit measures will be implemented. This comparison may be done, as a function of the operating level of the audit, using simplified methods or by evaluating the global effects, through a complete energy assessment by means of simulation softwa
作者: PARA    時間: 2025-3-23 00:37

作者: 追逐    時間: 2025-3-23 04:28
Green Energy Audit Versus LEED? Protocolsying credit criteria under the LEED? certification. The structures analysed are the opaque building envelope, the transparent envelope and related facilities, whilst activities considered are those regarding commissioning and water management. Once the applicable retrofit measures are identified, th
作者: 惡名聲    時間: 2025-3-23 09:14

作者: deadlock    時間: 2025-3-23 12:06
Contractual Issueslementation of the measures and the management of building and facilities the owner/client can refer to external companies. A careful definition of contractual issues is a key element to promote the sustainable upgrading of a building in a transparent and efficient way. This chapter analyses aspects
作者: 內(nèi)行    時間: 2025-3-23 14:11
Comfort and Well-Being of Occupantslity requires integration of all these factors and of all ventilation, thermal, acoustic and illumination solutions. This chapter introduces basic aspects of comfort and well-being of the occupants, with the objective of demonstrating that an energy saving approach does not mean a reduction in comfo
作者: 吞沒    時間: 2025-3-23 20:33

作者: BAN    時間: 2025-3-24 02:13
Masamitsu Nakazato,Hiroaki Uenodit methodology. Green Energy Audit proposes a different approach to the analysis of the existing buildings, the objective is to improve sustainability by applying retrofit measures not only in the area of energy efficiency. Finally, this chapter examines the structure of the book, defining the vari
作者: LIEN    時間: 2025-3-24 06:03
K. H. Hollmann,J. Brux,J. M. Verleyt make the process convenient, without ignoring the critical issues that may emerge from its incorrect application. The chapter explores the three operational levels of walkthrough audit, standard audit and simulation audit, highlighting the differences between the different approaches. Organisation
作者: Conflagration    時間: 2025-3-24 09:53

作者: 動物    時間: 2025-3-24 13:23
The future use of robots in shipbuildingdocumentation and administrative documentation that the client provides. This chapter has the objective of providing criteria and methods to effectively manage, in an orderly and efficient manner, this phase which, although preliminary, is nonetheless strategic. In order to support this phase, a set
作者: immunity    時間: 2025-3-24 15:08
New Frontiers in Offender Treatmentbut at the same time is an important opportunity to acquire information on the management procedures. The proper use of the survey instrumentation is fundamental at this stage. In the first part of the chapter, survey instruments required for the Green Energy Audit are selected and described with th
作者: 警告    時間: 2025-3-24 22:39
Ange-Therese Akono,Pooyan Kabirmography in the energy fields are very widespread, since through such an investigation, which is non-invasive, and a correct interpretation of infrared images, it is possible to highlight inefficiencies on buildings and facilities. This chapter describes the application of infrared audits in support
作者: 樹上結(jié)蜜糖    時間: 2025-3-25 00:45
New Frontiers in Organoselenium Compoundsion improved, i.e., that which is achieved after the retrofit measures will be implemented. This comparison may be done, as a function of the operating level of the audit, using simplified methods or by evaluating the global effects, through a complete energy assessment by means of simulation softwa
作者: Vasodilation    時間: 2025-3-25 05:37

作者: 難取悅    時間: 2025-3-25 07:45
Hepatocyte transplantation for liver diseaseying credit criteria under the LEED? certification. The structures analysed are the opaque building envelope, the transparent envelope and related facilities, whilst activities considered are those regarding commissioning and water management. Once the applicable retrofit measures are identified, th
作者: 不適當    時間: 2025-3-25 14:31

作者: anaerobic    時間: 2025-3-25 16:00
Social Innovation for Social Cohesionlementation of the measures and the management of building and facilities the owner/client can refer to external companies. A careful definition of contractual issues is a key element to promote the sustainable upgrading of a building in a transparent and efficient way. This chapter analyses aspects
作者: 間接    時間: 2025-3-25 20:58

作者: Fierce    時間: 2025-3-26 00:12

作者: 鐵砧    時間: 2025-3-26 05:07

作者: 鋪子    時間: 2025-3-26 10:48

作者: ETCH    時間: 2025-3-26 16:21

作者: 極大痛苦    時間: 2025-3-26 18:12

作者: LIKEN    時間: 2025-3-26 22:42
Infrared Auditd images, it is possible to highlight inefficiencies on buildings and facilities. This chapter describes the application of infrared audits in support of energy audits. The potential of this technique, but also its critical aspects due essentially to errors during the shooting and mistakes in thermogram interpretation will be discussed.
作者: 紀念    時間: 2025-3-27 01:51
Evaluation of the Performance Improvementg level of the audit, using simplified methods or by evaluating the global effects, through a complete energy assessment by means of simulation software. This chapter examines the issues of the evaluation of the performance improvement and provides the elements of choice to provide an approach consistent with the operational level adopted.
作者: epicondylitis    時間: 2025-3-27 05:54

作者: 雪上輕舟飛過    時間: 2025-3-27 12:21
Green Energy Audit Versus LEED? Protocolsilities, whilst activities considered are those regarding commissioning and water management. Once the applicable retrofit measures are identified, these are then cross-referenced with LEED? credits in order to evaluate the improvement in sustainability of the building.
作者: 嘮叨    時間: 2025-3-27 15:43

作者: ARK    時間: 2025-3-27 19:13

作者: humectant    時間: 2025-3-28 01:01

作者: arabesque    時間: 2025-3-28 06:05

作者: DECRY    時間: 2025-3-28 06:27

作者: 共棲    時間: 2025-3-28 13:37

作者: negligence    時間: 2025-3-28 16:22
Ange-Therese Akono,Pooyan Kabird images, it is possible to highlight inefficiencies on buildings and facilities. This chapter describes the application of infrared audits in support of energy audits. The potential of this technique, but also its critical aspects due essentially to errors during the shooting and mistakes in thermogram interpretation will be discussed.
作者: PALMY    時間: 2025-3-28 21:28

作者: 使困惑    時間: 2025-3-29 01:45
Takahiro Seki,Mitsuo Hara,Shusaku Naganoor this reason, its structure must be complete, rigorous and balanced between technical and economic aspects but also aimed at communicating well the results to the client/owner. This chapter provides the reader with guidelines for organising and structuring the green energy plan in accordance with these goals.
作者: 褲子    時間: 2025-3-29 03:04

作者: 輕快帶來危險    時間: 2025-3-29 11:07

作者: patriarch    時間: 2025-3-29 14:58

作者: RADE    時間: 2025-3-29 17:04
Introduction: Breaking with the Pastnted and discussed. The information contained, however, may in some cases also be used for buildings of new construction. For each of these measures, essential information needed to direct the auditor to the aspects to check and the necessary details to effect the measure correctly are provided.
作者: Pedagogy    時間: 2025-3-29 23:41

作者: indoctrinate    時間: 2025-3-30 03:30





歡迎光臨 派博傳思國際中心 (http://pjsxioz.cn/) Powered by Discuz! X3.5
鹤山市| 虎林市| 霍林郭勒市| 南江县| 扬中市| 吉水县| 汕尾市| 浪卡子县| 连云港市| 奎屯市| 唐山市| 精河县| 兰考县| 威信县| 石棉县| 嘉善县| 西林县| 长岛县| 沁阳市| 苏州市| 同仁县| 武穴市| 固阳县| 县级市| 连城县| 西丰县| 东莞市| 浦北县| 耿马| 尤溪县| 西乡县| 汕尾市| 夏河县| 泰安市| 博客| 大新县| 正宁县| 南昌县| 绥芬河市| 徐闻县| 苗栗市|