派博傳思國際中心

標(biāo)題: Titlebook: Electricity Transmission Pricing and Technology; Michael Einhorn,Riaz Siddiqi Book 1996 Kluwer Academic Publishers 1996 competition.electr [打印本頁]

作者: 尤指植物    時間: 2025-3-21 17:22
書目名稱Electricity Transmission Pricing and Technology影響因子(影響力)




書目名稱Electricity Transmission Pricing and Technology影響因子(影響力)學(xué)科排名




書目名稱Electricity Transmission Pricing and Technology網(wǎng)絡(luò)公開度




書目名稱Electricity Transmission Pricing and Technology網(wǎng)絡(luò)公開度學(xué)科排名




書目名稱Electricity Transmission Pricing and Technology被引頻次




書目名稱Electricity Transmission Pricing and Technology被引頻次學(xué)科排名




書目名稱Electricity Transmission Pricing and Technology年度引用




書目名稱Electricity Transmission Pricing and Technology年度引用學(xué)科排名




書目名稱Electricity Transmission Pricing and Technology讀者反饋




書目名稱Electricity Transmission Pricing and Technology讀者反饋學(xué)科排名





作者: 闡明    時間: 2025-3-21 21:16

作者: inculpate    時間: 2025-3-22 02:15

作者: outer-ear    時間: 2025-3-22 06:30
978-94-010-7304-2Kluwer Academic Publishers 1996
作者: Monocle    時間: 2025-3-22 10:58

作者: 套索    時間: 2025-3-22 16:44

作者: 套索    時間: 2025-3-22 18:33
Prenataal verworven kwetsbaarheidpply) and some degree of competition in generation and (sometimes) supply, are becoming commonplace in different parts of the world. Essential to most of these schemes is some form of open access to the transmission network. This is why the issues of transmission access, pricing and investment, whic
作者: byline    時間: 2025-3-23 00:14
https://doi.org/10.1007/978-90-313-7206-5attempts have been made in some countries to ram through new policies, rules, and regulations without adequate analyses, — some successful and some not. It is increasingly recognized that retail wheeling can affect the cost of electricity, the environment, and the reliability of our electric power s
作者: modifier    時間: 2025-3-23 03:14
Wim Snellen,Liesbeth Eurelings-Bontekoestry, sending shock waves through the industry. In particular, the CPUCs embrace of retail wheeling — or “direct access” in the parlance of the Blue Book proposals — sparked controversy. Critics assailed the CPUC for unleashing the precipitous $3 billion decline in the market value of the three majo
作者: 豐富    時間: 2025-3-23 06:33
Handboek persoonlijkheidspathologiers two methods of pricing transmission: “top-down” and “bottom-up”. The Federal Energy Regulatory Commission has recently established the principle that the terms and prices offered for transmission access must be comparable with those enjoyed by owners of the transmission system.. Any comparison of
作者: integral    時間: 2025-3-23 09:47

作者: 拋媚眼    時間: 2025-3-23 17:27
Janneke Belo,Fred Dijkers,Kees in ‘t Veld assets were established on a commercial footing as the Electricity Corporation of New Zealand Ltd. (ECNZ) with a national transmission grid company, Trans Power New Zealand Ltd, as a subsidiary. In 1994, Trans Power was completely separated from ECNZ, and both are now operating as independent State
作者: Epithelium    時間: 2025-3-23 19:53

作者: 一美元    時間: 2025-3-24 02:03

作者: municipality    時間: 2025-3-24 03:02

作者: Frequency-Range    時間: 2025-3-24 06:46

作者: 向前變橢圓    時間: 2025-3-24 11:41

作者: 準(zhǔn)則    時間: 2025-3-24 15:53

作者: chapel    時間: 2025-3-24 21:49

作者: hedonic    時間: 2025-3-25 00:24
Incorporating Network Effects in a Competitive Electricity Industry: An Australian Perspective,e electricity industry, some or all of these participants function as independent commercial entities. Two important problems must then be resolved in the commercial arrangements between the participants:
作者: 沒有希望    時間: 2025-3-25 06:40

作者: Fatten    時間: 2025-3-25 08:42

作者: Budget    時間: 2025-3-25 15:42

作者: 終點    時間: 2025-3-25 17:36
Marginal Pricing of Transmission Services: An Analysis of Cost Recovery,pply) and some degree of competition in generation and (sometimes) supply, are becoming commonplace in different parts of the world. Essential to most of these schemes is some form of open access to the transmission network. This is why the issues of transmission access, pricing and investment, whic
作者: omnibus    時間: 2025-3-26 00:01

作者: 阻礙    時間: 2025-3-26 02:11

作者: Fecal-Impaction    時間: 2025-3-26 05:52

作者: ligature    時間: 2025-3-26 10:30

作者: LEVER    時間: 2025-3-26 15:41
A Dispatch Based Pricing Model for the New Zealand Electricity Market, assets were established on a commercial footing as the Electricity Corporation of New Zealand Ltd. (ECNZ) with a national transmission grid company, Trans Power New Zealand Ltd, as a subsidiary. In 1994, Trans Power was completely separated from ECNZ, and both are now operating as independent State
作者: KEGEL    時間: 2025-3-26 20:12
Incorporating Network Effects in a Competitive Electricity Industry: An Australian Perspective,e electricity industry, some or all of these participants function as independent commercial entities. Two important problems must then be resolved in the commercial arrangements between the participants:
作者: 貪婪地吃    時間: 2025-3-26 22:40

作者: Trochlea    時間: 2025-3-27 04:22
Book 1996reation of future wealth would be better accomplished through redistribution of wealth today. Thoughtful individuals recognize the enormous responsibility placed upon the various entities empowered with jurisdiction over the timing and nature of the structural change. They are trying hard to bring a
作者: Mets552    時間: 2025-3-27 08:07
is that creation of future wealth would be better accomplished through redistribution of wealth today. Thoughtful individuals recognize the enormous responsibility placed upon the various entities empowered with jurisdiction over the timing and nature of the structural change. They are trying hard to bring a978-94-010-7304-2978-94-009-1804-7
作者: Flawless    時間: 2025-3-27 10:10

作者: 沙漠    時間: 2025-3-27 17:11
Prenataal verworven kwetsbaarheid of these schemes is some form of open access to the transmission network. This is why the issues of transmission access, pricing and investment, which are closely bound together, are frequently at the heart of these new regulation approaches.
作者: 混雜人    時間: 2025-3-27 18:25

作者: 清楚    時間: 2025-3-27 22:24

作者: 獸群    時間: 2025-3-28 03:37

作者: CHAR    時間: 2025-3-28 08:02

作者: Iatrogenic    時間: 2025-3-28 13:48

作者: Measured    時間: 2025-3-28 17:28
Electricity Transmission Pricing: How Contracts Must Reflect Costs,for transmission and costs of generation. Attempts to set transmission prices without reflecting the appropriate costs of generation will distort incentives for efficient use and development of the transmission system.
作者: textile    時間: 2025-3-28 19:00

作者: 彩色    時間: 2025-3-29 01:08

作者: 辯論    時間: 2025-3-29 06:14

作者: dragon    時間: 2025-3-29 09:59

作者: obligation    時間: 2025-3-29 14:15
https://doi.org/10.1007/978-90-313-6589-0ity and were largely short-term and nonfirm in nature. Transmission capacity was added by vertically integrated utilities to meet the owning systems’ needs. Revenue from the sale of transmission service was rarely as much as 5 percent of total transmission cost, or 1 percent of the utility’s total revenue.
作者: Acupressure    時間: 2025-3-29 16:08
Wim Snellen,Liesbeth Eurelings-Bontekoee competitive future. Whatever one’s perspective, however, no one could deny that the proposals initiated discussion and analysis that markedly advanced the understanding of structural requirements for competition in the electricity industry.




歡迎光臨 派博傳思國際中心 (http://pjsxioz.cn/) Powered by Discuz! X3.5
宁远县| 开远市| 灯塔市| 临泉县| 疏附县| 安图县| 攀枝花市| 弥勒县| 肥西县| 尚志市| 额敏县| 津南区| 莲花县| 榆中县| 罗平县| 淮北市| 松潘县| 旌德县| 怀仁县| 新泰市| 塔河县| 南川市| 通化市| 岑巩县| 洪泽县| 永春县| 武冈市| 临湘市| 凤庆县| 潢川县| 灵石县| 渑池县| 霞浦县| 渝中区| 河池市| 河间市| 彩票| 武宁县| 阿拉善右旗| 鲁山县| 敖汉旗|