派博傳思國際中心

標題: Titlebook: Determinants of Construction Project Success in India; Kumar Neeraj Jha Book 2013 Springer Science+Business Media Dordrecht 2013 Construct [打印本頁]

作者: 毛發(fā)    時間: 2025-3-21 18:08
書目名稱Determinants of Construction Project Success in India影響因子(影響力)




書目名稱Determinants of Construction Project Success in India影響因子(影響力)學科排名




書目名稱Determinants of Construction Project Success in India網(wǎng)絡公開度




書目名稱Determinants of Construction Project Success in India網(wǎng)絡公開度學科排名




書目名稱Determinants of Construction Project Success in India被引頻次




書目名稱Determinants of Construction Project Success in India被引頻次學科排名




書目名稱Determinants of Construction Project Success in India年度引用




書目名稱Determinants of Construction Project Success in India年度引用學科排名




書目名稱Determinants of Construction Project Success in India讀者反饋




書目名稱Determinants of Construction Project Success in India讀者反饋學科排名





作者: FECK    時間: 2025-3-21 22:47
Research Method,construction projects has led us to adopt questionnaire survey. Questions asked in the survey are described and the details of respondents and the participating organizations are provided. The analysis tool primarily consisted of univariate and multivariate analysis. Univariate analysis consisted of
作者: 乳白光    時間: 2025-3-22 02:36

作者: resistant    時間: 2025-3-22 04:44

作者: 朝圣者    時間: 2025-3-22 10:21

作者: FLOUR    時間: 2025-3-22 14:20
Success Traits for a Construction Project,ss’ is influenced by ‘success traits’ has been formulated. The hypothesized positive inter-relationships between success traits and project success have been tested using the structural equation modeling technique. Various steps taken for achieving the objectives are clearly outlined. The results of
作者: FLOUR    時間: 2025-3-22 17:51

作者: Breach    時間: 2025-3-22 22:11

作者: Fester    時間: 2025-3-23 03:29

作者: crumble    時間: 2025-3-23 09:06

作者: ATRIA    時間: 2025-3-23 10:00
Essentials of Friedmann–Lema?tre Modelsby a project coordinator also need to be explored and accordingly they have been considered as one of the objectives of the study. Chapter ends with a brief description of contents of different chapters.
作者: 裂縫    時間: 2025-3-23 14:43
https://doi.org/10.1007/978-3-030-61574-1ity objectives respectively.The research findings are validated through two fold approach: validation through case study and validation through structured interview. A total of twenty real life cases were studied and the research findings were found to be valid and consistent.
作者: 陰謀    時間: 2025-3-23 19:43

作者: consolidate    時間: 2025-3-23 23:23
General Relativity and Gravitationrrelationship with the project success. Coordination among project participants is also found to be important for project success. Various coordination issues have been discussed and the required traits of a project coordinator have been specified.
作者: Vulnerary    時間: 2025-3-24 03:58
Introduction,by a project coordinator also need to be explored and accordingly they have been considered as one of the objectives of the study. Chapter ends with a brief description of contents of different chapters.
作者: 四海為家的人    時間: 2025-3-24 06:42
Critical Success Factors for Projects,ity objectives respectively.The research findings are validated through two fold approach: validation through case study and validation through structured interview. A total of twenty real life cases were studied and the research findings were found to be valid and consistent.
作者: 連系    時間: 2025-3-24 10:52

作者: 串通    時間: 2025-3-24 15:18

作者: INERT    時間: 2025-3-24 21:31
Essentials of Friedmann–Lema?tre Modelshas been utilized. These tools are discussed in sufficient details for ease in understanding the subsequent chapters. For project performance prediction model, artificial neural network has been used which is also discussed in this chapter.
作者: sterilization    時間: 2025-3-25 00:05

作者: averse    時間: 2025-3-25 05:31

作者: eczema    時間: 2025-3-25 07:39

作者: Affirm    時間: 2025-3-25 12:37

作者: 微生物    時間: 2025-3-25 17:29
Success Traits for a Construction Project, It can be concluded that trained, committed, competent participant’s coordination, with constant monitoring and feedback with regular budget update will influence the successful completion of project.
作者: nutrients    時間: 2025-3-25 21:17
Voids in the Expanding Universe on their relative importance for a project coordinator through the analysis of questionnaire responses. The important traits have converged into three major skill categories: team building skill, contract implementation skill, and project organization skill.
作者: 諂媚于性    時間: 2025-3-26 00:21
Other Issues in Project Coordination and Traits of a Project Coordinator, on their relative importance for a project coordinator through the analysis of questionnaire responses. The important traits have converged into three major skill categories: team building skill, contract implementation skill, and project organization skill.
作者: expository    時間: 2025-3-26 08:13

作者: GRATE    時間: 2025-3-26 10:14
Determinants of Construction Project Success in India978-94-007-6256-5Series ISSN 1566-0443 Series E-ISSN 2215-0285
作者: plasma    時間: 2025-3-26 12:39

作者: 簡潔    時間: 2025-3-26 17:45

作者: Truculent    時間: 2025-3-26 22:13
https://doi.org/10.1007/978-94-007-6256-5Construction Project Management; Project Coordinator‘s Traits; Project Failure Factor; Project Success
作者: Triglyceride    時間: 2025-3-27 01:06
978-94-017-8183-1Springer Science+Business Media Dordrecht 2013
作者: V洗浴    時間: 2025-3-27 05:56
Essentials of Friedmann–Lema?tre Modelsccess and the criteria employed to measure the success is presented. The performances of construction projects in general are not up to the mark and thus it is imperative to understand the factors for ensuring success in a project. The reasons why a project fails are also equally important. It would
作者: Homocystinuria    時間: 2025-3-27 11:56
Essentials of Friedmann–Lema?tre Modelsconstruction projects has led us to adopt questionnaire survey. Questions asked in the survey are described and the details of respondents and the participating organizations are provided. The analysis tool primarily consisted of univariate and multivariate analysis. Univariate analysis consisted of
作者: 公共汽車    時間: 2025-3-27 13:51

作者: craven    時間: 2025-3-27 18:18

作者: 煤渣    時間: 2025-3-27 23:24
A Brief Stroll in Special Relativitytor variables used to predict the performance of the construction project. In this chapter the 11 success factors derived earlier have been revisited. Out of these factors, project performance predictors have been identified using artificial neural network. Literature pertaining to performance predi
作者: 跳動    時間: 2025-3-28 05:39
General Relativity and Cosmologyss’ is influenced by ‘success traits’ has been formulated. The hypothesized positive inter-relationships between success traits and project success have been tested using the structural equation modeling technique. Various steps taken for achieving the objectives are clearly outlined. The results of
作者: tenuous    時間: 2025-3-28 06:36
The Dynamical Equations of Cosmology for achieving day-to-day coordination in a construction project have been identified. Based on the analysis of questionnaire responses the coordination activities have been ranked in descending order of their importance on the four performance criteria: schedule, cost, quality, and no-dispute. The
作者: 不發(fā)音    時間: 2025-3-28 11:06

作者: BOOM    時間: 2025-3-28 15:21
General Relativity and Gravitationhrough a two-stage questionnaire survey to identify the critical success factor for four project performance criteria: schedule, cost, quality, and no-dispute. Critical success factors vary across the four performance criteria and the impact they have on project performance is dependent on the curre




歡迎光臨 派博傳思國際中心 (http://pjsxioz.cn/) Powered by Discuz! X3.5
安乡县| 梓潼县| 高尔夫| 乌拉特前旗| 隆尧县| 武山县| 水富县| 长顺县| 乐清市| 龙胜| 武邑县| 阿拉善右旗| 南乐县| 南平市| 磐石市| 奉化市| 三穗县| 平阳县| 子长县| 惠州市| 安图县| 咸丰县| 瑞金市| 临泉县| 夹江县| 乐昌市| 金昌市| 延长县| 南溪县| 襄汾县| 云阳县| 探索| 三台县| 伊宁市| 土默特左旗| 望城县| 休宁县| 广南县| 嘉峪关市| 翁源县| 光泽县|