標題: Titlebook: Civil Engineering Construction Design and Management; Dene R. Warren Textbook 1996Latest edition Dene R. Warren 1996 civil engineering.con [打印本頁] 作者: 從未沮喪 時間: 2025-3-21 18:33
書目名稱Civil Engineering Construction Design and Management影響因子(影響力)
書目名稱Civil Engineering Construction Design and Management影響因子(影響力)學科排名
書目名稱Civil Engineering Construction Design and Management網(wǎng)絡公開度
書目名稱Civil Engineering Construction Design and Management網(wǎng)絡公開度學科排名
書目名稱Civil Engineering Construction Design and Management被引頻次
書目名稱Civil Engineering Construction Design and Management被引頻次學科排名
書目名稱Civil Engineering Construction Design and Management年度引用
書目名稱Civil Engineering Construction Design and Management年度引用學科排名
書目名稱Civil Engineering Construction Design and Management讀者反饋
書目名稱Civil Engineering Construction Design and Management讀者反饋學科排名
作者: FILTH 時間: 2025-3-21 21:23 作者: 真實的你 時間: 2025-3-22 02:29
,Insbesondere: das Neutralit?tsgebot,r-logged conditions can slow work considerably and cause safety problems, such as erosion or collapse of the sides of an excavation, or even flooding, and so ground water must be controlled to carry out work effectively. It is not possible to consider ground water control without also looking at gro作者: Somber 時間: 2025-3-22 05:32
https://doi.org/10.1007/978-3-540-72049-2on. An important message which must be given to the Client from an early stage is that money spent on the foundations is money well spent. It must be considered as an investment in the structural integrity of the building which will pay dividends well into the future. The consequences of a foundatio作者: 大約冬季 時間: 2025-3-22 12:03
Kirchenmitgliedschaft und Kirchensteuer,vide support to the ground in both the permanent and temporary condition, but they are expensive to construct, so the Engineer will try to use an embankment or self-supporting slope wherever possible. Only after eliminating this option will a retaining structure of some form be considered. Retaining作者: 荒唐 時間: 2025-3-22 16:21
Religions- und Weltanschauungsrecht forms of construction. On the approval by the Client of a particular scheme the Architect will appoint a Structural Engineer to carry out the detailed analysis of the structure. The precise time and brief for the Engineer will vary from structure to structure, but in most cases the Engineer will de作者: 荒唐 時間: 2025-3-22 19:22
Religions- und Weltanschauungsrechtter drainage designed to dispose of sewage. The design of each is based on the same hydraulic principles. In this chapter we shall concentrate on surface water drainage, indicating the differences between foul and surface water when appropriate. The chapter begins by considering a simplified method 作者: muscle-fibers 時間: 2025-3-23 00:06
https://doi.org/10.1007/978-3-540-72049-2ear on construction and maintenance. The need for reliable durable roads was realised in Britain during the Industrial Revolution and two men were instrumental in their provision, John Macadam and Thomas Telford. Telford’s construction consisted of layers of hand pitched stone, decreasing in size to作者: Limpid 時間: 2025-3-23 02:56 作者: 小畫像 時間: 2025-3-23 08:54 作者: 項目 時間: 2025-3-23 11:13
Safety,The construction industry in Great Britain has one of the worst accident records in the European Community. Although the figures have been falling recently, in 1993/94 65 people were killed and 11,118 people injured. Of the 65 fatalities the causes break down as shown in figure 3.1作者: MAZE 時間: 2025-3-23 16:53 作者: Hearten 時間: 2025-3-23 20:14 作者: 背書 時間: 2025-3-23 22:26 作者: 高爾夫 時間: 2025-3-24 03:20
http://image.papertrans.cn/c/image/226867.jpg作者: 樹木心 時間: 2025-3-24 09:35
Textbook 1996Latest editionA textbook for HNC/HND students of civil engineering. Covers contract administration, control and programming, safety, ground water control, excavation, foundations, retaining walls and deep basements, superstructures and road pavements.作者: 債務 時間: 2025-3-24 13:40
https://doi.org/10.1007/978-1-349-13727-5civil engineering; construction; contract; control; design; engine; foundation; management; pavement; program作者: inspiration 時間: 2025-3-24 16:10 作者: ovation 時間: 2025-3-24 22:45 作者: 沉默 時間: 2025-3-24 23:19 作者: 咯咯笑 時間: 2025-3-25 04:17
Control,ture for Client and Contractor and go on to examine the details of financial control on site. An overview of quality control is followed by a detailed look at the techniques available to site managers to exercise operational control.作者: insert 時間: 2025-3-25 10:50 作者: Engaging 時間: 2025-3-25 13:52
Foundation Construction and Design,n failure can be huge and even threaten personal safety; for this reason a Chartered Civil Engineer must be employed to gain sufficient information about the ground conditions, design the foundations and oversee the construction.作者: AMITY 時間: 2025-3-25 16:41
Drainage,of design and goes on to look at construction and some recent developments in trenchless technology. This chapter must be considered as an introduction to drainage design; more detailed information is available from the references made within the text, from the manufacturers and from the Water Research Council.作者: 吸氣 時間: 2025-3-25 22:09 作者: erythema 時間: 2025-3-26 03:54
Ground Water Control, and so ground water must be controlled to carry out work effectively. It is not possible to consider ground water control without also looking at ground support methods since many systems have a dual purpose. Such systems will be explained within the text. In general there are two types of water to control.作者: Monotonous 時間: 2025-3-26 05:30 作者: 合群 時間: 2025-3-26 09:52 作者: Iatrogenic 時間: 2025-3-26 15:32 作者: 怪物 時間: 2025-3-26 19:42
https://doi.org/10.1007/978-3-540-72049-2thereby proved stronger at less cost. Both men realised the need for a foundation or capping layer and both realised the importance of drainage to maintain the strength of the road. With the advent of the motor car, dust proved to be a problem and tar was spread on the surface of the road to bind it together.作者: 鋼盔 時間: 2025-3-26 21:00 作者: inscribe 時間: 2025-3-27 03:31 作者: MUMP 時間: 2025-3-27 08:55
Contract Administration,e need funding. This may come from a private or governmental source but in either case some form of study is required to prove demand and viability. Professional help in the form of a Civil Engineer or Architect should be employed to help the Client put together a feasibility study and subsequently 作者: 體貼 時間: 2025-3-27 10:01
Control,ch effort has already been expended by the Client and his advisors to define what is required and it is now the duty of the supervising Engineer and the Contractor to ensure that the Client is satisfied with the final product. That will mean a project which is completed on time, within budget and to作者: 準則 時間: 2025-3-27 14:58
Ground Water Control,r-logged conditions can slow work considerably and cause safety problems, such as erosion or collapse of the sides of an excavation, or even flooding, and so ground water must be controlled to carry out work effectively. It is not possible to consider ground water control without also looking at gro作者: 支架 時間: 2025-3-27 21:27 作者: Oafishness 時間: 2025-3-28 00:15
Retaining Walls and Deep Basements,vide support to the ground in both the permanent and temporary condition, but they are expensive to construct, so the Engineer will try to use an embankment or self-supporting slope wherever possible. Only after eliminating this option will a retaining structure of some form be considered. Retaining作者: 先驅(qū) 時間: 2025-3-28 03:08
Superstructures, forms of construction. On the approval by the Client of a particular scheme the Architect will appoint a Structural Engineer to carry out the detailed analysis of the structure. The precise time and brief for the Engineer will vary from structure to structure, but in most cases the Engineer will de作者: ESO 時間: 2025-3-28 08:36
Drainage,ter drainage designed to dispose of sewage. The design of each is based on the same hydraulic principles. In this chapter we shall concentrate on surface water drainage, indicating the differences between foul and surface water when appropriate. The chapter begins by considering a simplified method 作者: interpose 時間: 2025-3-28 13:24 作者: GET 時間: 2025-3-28 15:14
Civil Engineering Construction Design and Management作者: uncertain 時間: 2025-3-28 22:46 作者: 招待 時間: 2025-3-28 23:11
9樓作者: 跑過 時間: 2025-3-29 03:52
10樓作者: fixed-joint 時間: 2025-3-29 09:06
10樓作者: SUGAR 時間: 2025-3-29 12:23
10樓作者: visual-cortex 時間: 2025-3-29 18:21
10樓