標題: Titlebook: Capacitated Lot Sizing Problems in Process Industries; Ravi Ramya,Chandrasekharan Rajendran,K. Ganesh Book 2019 Springer Nature Switzerlan [打印本頁] 作者: CANTO 時間: 2025-3-21 18:51
書目名稱Capacitated Lot Sizing Problems in Process Industries影響因子(影響力)
書目名稱Capacitated Lot Sizing Problems in Process Industries影響因子(影響力)學科排名
書目名稱Capacitated Lot Sizing Problems in Process Industries網(wǎng)絡公開度
書目名稱Capacitated Lot Sizing Problems in Process Industries網(wǎng)絡公開度學科排名
書目名稱Capacitated Lot Sizing Problems in Process Industries被引頻次
書目名稱Capacitated Lot Sizing Problems in Process Industries被引頻次學科排名
書目名稱Capacitated Lot Sizing Problems in Process Industries年度引用
書目名稱Capacitated Lot Sizing Problems in Process Industries年度引用學科排名
書目名稱Capacitated Lot Sizing Problems in Process Industries讀者反饋
書目名稱Capacitated Lot Sizing Problems in Process Industries讀者反饋學科排名
作者: 容易生皺紋 時間: 2025-3-21 23:52 作者: 法律的瑕疵 時間: 2025-3-22 01:30
Capacitated Lot Sizing Problems in Process Industries作者: Alveolar-Bone 時間: 2025-3-22 07:13
Capacitated Lot Sizing Problems in Process Industries978-3-030-01222-9作者: Notify 時間: 2025-3-22 12:07
Book 2019hout any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that作者: 符合你規(guī)定 時間: 2025-3-22 15:20
Further Development: Mathematical Model 2 (MM2) and a Comprehensive Heuristic for Capacitated Lot Sin this chapter is easier to apply. Hence, in this chapter we propose a second mathematical model (MM2:CLSP-PCSC) for the CLSP-PCSC followed by a heuristic using the second mathematical model. The proposed model in this chapter is not constrained by the consideration of long setup products. The mode作者: 符合你規(guī)定 時間: 2025-3-22 18:44 作者: Fortuitous 時間: 2025-3-22 23:20
http://image.papertrans.cn/c/image/221356.jpg作者: 方便 時間: 2025-3-23 02:45 作者: LEVY 時間: 2025-3-23 07:55 作者: 表主動 時間: 2025-3-23 12:22 作者: cushion 時間: 2025-3-23 14:58 作者: 慎重 時間: 2025-3-23 18:17 作者: 改革運動 時間: 2025-3-23 23:54
Francesca Manes-Rossi,Rebecca Levy Orellig under the assumption that demand was deterministic and time varying (dynamic). In due course, research on production planning evolved with the development of Harris’s EOQ (Economic Order Quantity) formula, Wilsons’s (.,.) model, and the dynamic lot sizing model proposed by Wagner and Whitin. Harri作者: COUCH 時間: 2025-3-24 03:17 作者: 手榴彈 時間: 2025-3-24 10:34 作者: Ceremony 時間: 2025-3-24 13:02 作者: 破譯 時間: 2025-3-24 18:52
F. Mele,N. Russo,M. Toscano,F. Illasblems can be classified into continuous lot sizing problem (economic lot scheduling problem) and dynamic lot sizing problem. The time scale considered is continuous and infinite in the continuous lot sizing problem, whereas a discrete time scale is considered in dynamic lot sizing problems. The dyna作者: Chromatic 時間: 2025-3-24 19:02 作者: 人類學家 時間: 2025-3-24 23:28 作者: Herbivorous 時間: 2025-3-25 05:54 作者: 可耕種 時間: 2025-3-25 09:51 作者: Affirm 時間: 2025-3-25 14:14
Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover Across Periods Assuminperiods. Heuristics based on both the mathematical models have also been proposed. The models and heuristics address real-life situations in process industries such as production immediately after setup and uninterrupted production carryover across periods.作者: 截斷 時間: 2025-3-25 16:56 作者: BOOM 時間: 2025-3-25 20:40
Francesca Manes-Rossi,Rebecca Levy Orelliformula as it was used in practice by Wilson (Wilson?1934). Wagner and Whitin developed the dynamic lot sizing problem in 1958 (Wagner and Whitin?1958). Since then, researchers deal with various types of lot sizing problems for different applications (also see Manne?(1958)).作者: 冷淡一切 時間: 2025-3-26 00:32 作者: Leaven 時間: 2025-3-26 05:13
Book 2019ucts have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has i作者: commensurate 時間: 2025-3-26 09:31 作者: 帶傷害 時間: 2025-3-26 16:32 作者: 歡笑 時間: 2025-3-26 19:44
rios/considerations in process industries such as production.This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent producti作者: podiatrist 時間: 2025-3-26 23:01 作者: Toxoid-Vaccines 時間: 2025-3-27 04:34 作者: 公豬 時間: 2025-3-27 07:13
9樓作者: ear-canal 時間: 2025-3-27 12:04
10樓作者: compassion 時間: 2025-3-27 16:12
10樓作者: epicondylitis 時間: 2025-3-27 18:29
10樓作者: Paleontology 時間: 2025-3-28 00:10
10樓