標(biāo)題: Titlebook: BIM in Bridge and Infrastructure Design; Digital Building Mod Markus N?ldgen Book 2022 Springer Fachmedien Wiesbaden GmbH, part of Springer [打印本頁(yè)] 作者: 灰塵 時(shí)間: 2025-3-21 19:27
書目名稱BIM in Bridge and Infrastructure Design影響因子(影響力)
書目名稱BIM in Bridge and Infrastructure Design影響因子(影響力)學(xué)科排名
書目名稱BIM in Bridge and Infrastructure Design網(wǎng)絡(luò)公開度
書目名稱BIM in Bridge and Infrastructure Design網(wǎng)絡(luò)公開度學(xué)科排名
書目名稱BIM in Bridge and Infrastructure Design被引頻次
書目名稱BIM in Bridge and Infrastructure Design被引頻次學(xué)科排名
書目名稱BIM in Bridge and Infrastructure Design年度引用
書目名稱BIM in Bridge and Infrastructure Design年度引用學(xué)科排名
書目名稱BIM in Bridge and Infrastructure Design讀者反饋
書目名稱BIM in Bridge and Infrastructure Design讀者反饋學(xué)科排名
作者: ANTIC 時(shí)間: 2025-3-21 22:17
Book 2022IM process..In mechanical engineering drawings and simulations are derivedfrom the 3D-Model for many years already so that these options are refered to in this textbook with the focus on design-embedded-simulations for bridge structures. The technique of isogeometric modeling and a linked finite-ele作者: 疏忽 時(shí)間: 2025-3-22 00:55
.Step-by-step learning with additional e-learning material fThe textbook is addressed to students, structural draftsmen and structural engineers who are involved in the design of structures in the course of roads and railways with a focus on Building Information Modeling (BIM).Based on selected simp作者: Galactogogue 時(shí)間: 2025-3-22 04:58
Seyedsina Moeinzadeh,Esmaiel Jabbaridinal and transverse inclination as well as transverse systems and component connections are often neglected or idealized by substitute measures (additional forces and moments as well as kinematic couplings or similar). This results in a second structural model in addition to the design model, which is not associative to the design model.作者: 弓箭 時(shí)間: 2025-3-22 10:01 作者: adipose-tissue 時(shí)間: 2025-3-22 16:53 作者: MURKY 時(shí)間: 2025-3-22 19:02 作者: 決定性 時(shí)間: 2025-3-23 00:26
BIM2FEM - Design Embedded Simulation in Concrete Bridge Construction,der to keep the effort low and at the same time to adequately capture all relevant inputs and effects. The actual geometry with its curvature, longitudinal and transverse inclination as well as transverse systems and component connections are often neglected or idealized by substitute measures (addi作者: cardiac-arrest 時(shí)間: 2025-3-23 04:26 作者: 可互換 時(shí)間: 2025-3-23 07:43
Vasanthakumar Arumugam,Kandasamy G. Moodleyg five selected examples, with important notes and brief explanations. First, some recurring terms are explained, which are fundamental for understanding. Finally, some important general functions and shortcuts in NX are listed, which facilitate working with the 3D model.作者: 藥物 時(shí)間: 2025-3-23 12:03
Vasanthakumar Arumugam,Kandasamy G. Moodleyg five selected examples, with important notes and brief explanations. First, some recurring terms are explained, which are fundamental for understanding. Finally, some important general functions and shortcuts in NX are listed, which facilitate working with the 3D model.作者: guardianship 時(shí)間: 2025-3-23 17:48
Seyedsina Moeinzadeh,Esmaiel Jabbarider to keep the effort low and at the same time to adequately capture all relevant inputs and effects. The actual geometry with its curvature, longitudinal and transverse inclination as well as transverse systems and component connections are often neglected or idealized by substitute measures (addi作者: 耕種 時(shí)間: 2025-3-23 21:17 作者: EVEN 時(shí)間: 2025-3-23 22:21
http://image.papertrans.cn/b/image/180116.jpg作者: 嘴唇可修剪 時(shí)間: 2025-3-24 02:56 作者: 改良 時(shí)間: 2025-3-24 06:42
978-3-658-36800-5Springer Fachmedien Wiesbaden GmbH, part of Springer Nature 2022作者: Melodrama 時(shí)間: 2025-3-24 14:22
Vasanthakumar Arumugam,Kandasamy G. Moodley There are several 3D-CAD Systems used at the Cologne University of Applied Sciences today. For the modeling of alignment-based and route-bound structures the software Siemens NX, Version 1953, is used to work out the examples within this book to explain the fundamental logic and techniques step-by-step.作者: 時(shí)間等 時(shí)間: 2025-3-24 15:35 作者: 兵團(tuán) 時(shí)間: 2025-3-24 21:14
https://doi.org/10.1007/978-3-030-36268-3Günthner, W.A.; Borrmann, A. (Eds.): Digitale Baustelle - innovativer Planen, effizienter Ausführen - Werkzeuge und Methoden für das Bauen im 21. Jahrhundert, 2011, Springer VDI Verlag作者: 細(xì)絲 時(shí)間: 2025-3-25 01:52 作者: SMART 時(shí)間: 2025-3-25 05:52
Project example: Two-span bridge,In addition to 3D design, the assignment of information such as material, object properties and 3D measurements in the model, the geometric collision control of components from different trades, the generation of part families, the IFC export and the options for construction phase display are also demonstrated. The main 作者: Obvious 時(shí)間: 2025-3-25 11:06 作者: 根除 時(shí)間: 2025-3-25 15:04
7樓作者: Indigence 時(shí)間: 2025-3-25 16:39
7樓作者: forthy 時(shí)間: 2025-3-25 20:33
7樓作者: inquisitive 時(shí)間: 2025-3-26 00:38
8樓作者: Femine 時(shí)間: 2025-3-26 07:31
8樓作者: COWER 時(shí)間: 2025-3-26 11:27
8樓作者: 共同確定為確 時(shí)間: 2025-3-26 14:58
9樓作者: 戰(zhàn)役 時(shí)間: 2025-3-26 18:03
9樓作者: 喃喃而言 時(shí)間: 2025-3-26 21:54
9樓作者: chemical-peel 時(shí)間: 2025-3-27 02:33
9樓作者: overreach 時(shí)間: 2025-3-27 07:48
10樓作者: ABHOR 時(shí)間: 2025-3-27 13:17
10樓作者: Hemodialysis 時(shí)間: 2025-3-27 17:22
10樓作者: 健談 時(shí)間: 2025-3-27 19:34
10樓