標(biāo)題: Titlebook: Application of Mathematics and Optimization in Construction Project Management; Hêri? Golp?ra Book 2021 The Editor(s) (if applicable) and [打印本頁] 作者: 小客車 時(shí)間: 2025-3-21 18:36
書目名稱Application of Mathematics and Optimization in Construction Project Management影響因子(影響力)
書目名稱Application of Mathematics and Optimization in Construction Project Management影響因子(影響力)學(xué)科排名
書目名稱Application of Mathematics and Optimization in Construction Project Management網(wǎng)絡(luò)公開度
書目名稱Application of Mathematics and Optimization in Construction Project Management網(wǎng)絡(luò)公開度學(xué)科排名
書目名稱Application of Mathematics and Optimization in Construction Project Management被引頻次
書目名稱Application of Mathematics and Optimization in Construction Project Management被引頻次學(xué)科排名
書目名稱Application of Mathematics and Optimization in Construction Project Management年度引用
書目名稱Application of Mathematics and Optimization in Construction Project Management年度引用學(xué)科排名
書目名稱Application of Mathematics and Optimization in Construction Project Management讀者反饋
書目名稱Application of Mathematics and Optimization in Construction Project Management讀者反饋學(xué)科排名
作者: 你敢命令 時(shí)間: 2025-3-21 22:12 作者: 本能 時(shí)間: 2025-3-22 00:54
https://doi.org/10.1007/978-3-030-81123-5Optimizations and Solution Techniques; Temporary Organization; Mathematical Models in Project Manageme作者: fleeting 時(shí)間: 2025-3-22 05:08 作者: 危機(jī) 時(shí)間: 2025-3-22 12:04
P. Alken,T. Sch?rfe,C. Hammer,J. Thüroff that provides a general and accurate summary of the concept of project management and corresponding concepts. Definitions of relative terms are collected and expressed concerning influential studies in the literature of the concept. Although there are several research works on the definitions of pr作者: 新娘 時(shí)間: 2025-3-22 16:51
Percutaneous Treatment of Staghorn Calculi,ther recent survey papers from the literature focus either only on models or discuss solution methods for a specific type of model, this contribution provides a broader survey that covers the most important models as well as related solution approaches. The paper sketches out and classifies the most作者: 誹謗 時(shí)間: 2025-3-22 20:05 作者: 彎腰 時(shí)間: 2025-3-22 21:21
Eddie Shu-yin Chan,Tadashi Matsudahe project planned duration and budget. Therefore, time and cost management of project activities is important in any project. Project activities can often be performed in one of several alternatives, also known as modes or options, each with its unique duration and cost requirements. A common pract作者: 骨 時(shí)間: 2025-3-23 05:02
Bryan Kwun-Chung Cheng,Jeremy Yuen-Chun Teohr obtains minimum cost/duration for the project. It is, in its continuous or discrete variants, generally dealt with the deterministic or nondeterministic mathematical, heuristic, and metaheuristic approaches. Stochastic, fuzzy, and robust optimizations are the modeling approaches that are widely us作者: 男生戴手銬 時(shí)間: 2025-3-23 07:11
Michael Alfred V. Tan,Dennis G. Lusaya of review articles on time–cost–quality trade-off problems in the research background, so far no research emphasizes only the review of mathematical modeling of the quality dimension of the construction projects. Besides, no research explains the mathematical details of modeling, solution approache作者: 高射炮 時(shí)間: 2025-3-23 10:16 作者: eustachian-tube 時(shí)間: 2025-3-23 16:08 作者: extinct 時(shí)間: 2025-3-23 18:16 作者: 宴會(huì) 時(shí)間: 2025-3-24 00:09 作者: 附錄 時(shí)間: 2025-3-24 02:34
Book 2021 the art of applications of the project management concepts, especially in the field of construction projects, based on the Project Management Body of Knowledge (PMBOK). The slate of geographically and professionally diverse authors illustrates project management as a multidisciplinary undertaking t作者: garrulous 時(shí)間: 2025-3-24 08:47
ates project management as a multidisciplinary undertaking that integrates renewable and non-renewable resources in a systematic process to achieve project goals. The book describes assessment based on technical and operational goals and meeting schedules and budgets.?..?..978-3-030-81125-9978-3-030-81123-5作者: MOCK 時(shí)間: 2025-3-24 13:05
Percutaneous Treatment of Staghorn Calculi,various objectives, and stochastic aspects. Moreover, related algorithms are outlined, ranging from exact to heuristic (and in particular metaheuristic) algorithms. Finally, current research directions in project scheduling are discussed.作者: disciplined 時(shí)間: 2025-3-24 15:35 作者: 凹室 時(shí)間: 2025-3-24 21:03 作者: 范圍廣 時(shí)間: 2025-3-25 01:09
Optimization for Project Resource Management,timization model and its benefits from the implementation in construction projects. Furthermore, some potential research areas in resource management are suggested which can be carried out in the future.作者: pacific 時(shí)間: 2025-3-25 06:39
employed in the project management.Includes discussion on fu.This book provides a broad overview of project and project management principles, processes, and success/failure factors. It also provides a state of the art of applications of the project management concepts, especially in the field of co作者: enflame 時(shí)間: 2025-3-25 07:44
Simulation Training of Laparoscopyclassify the mathematical aspects of the problem modeling and solution approaches. Besides, no research explains the mathematical details of modeling, solution methods, and the development process of the problem. This chapter is organized to cover these research gaps and proposing some potentials for further extension of the concept.作者: Substitution 時(shí)間: 2025-3-25 13:15
Michael Alfred V. Tan,Dennis G. Lusayamodeling of the quality dimension of the construction projects. Besides, no research explains the mathematical details of modeling, solution approaches, and their extension process. This chapter is organized to cover these research gaps and proposing some potentials for further extension of the concept.作者: acclimate 時(shí)間: 2025-3-25 17:00
A. H?cker,M.S. Michel,K.U. K?hrmann of PSM methods in construction projects, scattered studies need to be summarized, coordinated, and analyzed with a comprehensive view. The research at hand is provided to fill this gap; focusing on the applications of mathematical approaches may be useful to further extend the concept.作者: Infusion 時(shí)間: 2025-3-25 23:46 作者: 出處 時(shí)間: 2025-3-26 01:48 作者: GRUEL 時(shí)間: 2025-3-26 05:06 作者: 壁畫 時(shí)間: 2025-3-26 11:42 作者: 影響深遠(yuǎn) 時(shí)間: 2025-3-26 14:35
Book 2021hat integrates renewable and non-renewable resources in a systematic process to achieve project goals. The book describes assessment based on technical and operational goals and meeting schedules and budgets.?..?..作者: 和平主義者 時(shí)間: 2025-3-26 17:00 作者: resuscitation 時(shí)間: 2025-3-26 23:50 作者: colloquial 時(shí)間: 2025-3-27 03:33 作者: GRIN 時(shí)間: 2025-3-27 05:42 作者: Cocker 時(shí)間: 2025-3-27 11:57
Eddie Shu-yin Chan,Tadashi Matsudahe research is that not only the past research trend in the field of CSC is considered from the point of view of mathematical modeling and optimization, but also the existing research gaps are extracted and the existing potentials for future research are introduced.作者: gerontocracy 時(shí)間: 2025-3-27 14:07
Overview of Project Management, that provides a general and accurate summary of the concept of project management and corresponding concepts. Definitions of relative terms are collected and expressed concerning influential studies in the literature of the concept. Although there are several research works on the definitions of pr作者: CLASP 時(shí)間: 2025-3-27 20:09
Optimization Models and Solution Techniques,ther recent survey papers from the literature focus either only on models or discuss solution methods for a specific type of model, this contribution provides a broader survey that covers the most important models as well as related solution approaches. The paper sketches out and classifies the most作者: 省略 時(shí)間: 2025-3-27 22:40 作者: Iniquitous 時(shí)間: 2025-3-28 02:32
Optimization for Project Cost Management,he project planned duration and budget. Therefore, time and cost management of project activities is important in any project. Project activities can often be performed in one of several alternatives, also known as modes or options, each with its unique duration and cost requirements. A common pract作者: wall-stress 時(shí)間: 2025-3-28 06:19 作者: 巧思 時(shí)間: 2025-3-28 13:07 作者: 不透明性 時(shí)間: 2025-3-28 14:46
Optimization for Construction Supply Chain Management,C) concept. Since the trend of academicians and practitioners to the CSC has increased and no review of the recent research with emphasis on mathematical modeling and optimization approaches has been done so far, the contribution of this research is unique and interesting. The main contribution of t作者: 正式通知 時(shí)間: 2025-3-28 20:48 作者: 褪色 時(shí)間: 2025-3-29 00:55
Project Stakeholder Management,ecent literature, on the topic shedding light on new insights regarding the PSM concept. Although many researchers have grappled with the applications of PSM methods in construction projects, scattered studies need to be summarized, coordinated, and analyzed with a comprehensive view. The research a作者: Carminative 時(shí)間: 2025-3-29 05:37
Optimization for Project Risk Management,n technologies. Identifying the least risky alternative is not possible before identifying and assessing the risks of each alternative. This leads to Multi-Attribute Decision Making (MADM) problem where the alternatives are evaluated against the identified risks and the least risky alternative is se作者: opalescence 時(shí)間: 2025-3-29 07:13 作者: PACK 時(shí)間: 2025-3-29 12:28 作者: goodwill 時(shí)間: 2025-3-29 16:26
Application of Mathematics and Optimization in Construction Project Management作者: Patrimony 時(shí)間: 2025-3-29 21:45