派博傳思國(guó)際中心

標(biāo)題: Titlebook: Analysis and Modeling of Manufacturing Systems; Stanley B. Gershwin,Yves Dallery,J. MacGregor Smit Book 2003 Springer Science+Business Med [打印本頁(yè)]

作者: Coagulant    時(shí)間: 2025-3-21 16:58
書目名稱Analysis and Modeling of Manufacturing Systems影響因子(影響力)




書目名稱Analysis and Modeling of Manufacturing Systems影響因子(影響力)學(xué)科排名




書目名稱Analysis and Modeling of Manufacturing Systems網(wǎng)絡(luò)公開(kāi)度




書目名稱Analysis and Modeling of Manufacturing Systems網(wǎng)絡(luò)公開(kāi)度學(xué)科排名




書目名稱Analysis and Modeling of Manufacturing Systems被引頻次




書目名稱Analysis and Modeling of Manufacturing Systems被引頻次學(xué)科排名




書目名稱Analysis and Modeling of Manufacturing Systems年度引用




書目名稱Analysis and Modeling of Manufacturing Systems年度引用學(xué)科排名




書目名稱Analysis and Modeling of Manufacturing Systems讀者反饋




書目名稱Analysis and Modeling of Manufacturing Systems讀者反饋學(xué)科排名





作者: compel    時(shí)間: 2025-3-21 21:21
Capacitated Two-Echelon Inventory Models for Repairable Item Systems, needed, the base orders an item from the central spare parts stock to replenish its local stock, while the failed item is added to the central stock after repair. Orders are satisfied on a first-come-first-serve basis while any requirement that cannot be satisfied immediately either at the bases or
作者: 類似思想    時(shí)間: 2025-3-22 01:13

作者: Negligible    時(shí)間: 2025-3-22 06:56
Performance Evaluation of Production Lines with Random Processing Times, Multiple Failure Modes ande disruption propagation. Simulation and numerical experiments are carried out to show the performance of the new method in comparison with existing ones. The method can be extended to the analysis of larger open systems, such as assembly/disassembly networks, and systems with loops.
作者: 托運(yùn)    時(shí)間: 2025-3-22 10:03

作者: Pericarditis    時(shí)間: 2025-3-22 15:49
https://doi.org/10.1007/978-3-031-29857-8 needed, the base orders an item from the central spare parts stock to replenish its local stock, while the failed item is added to the central stock after repair. Orders are satisfied on a first-come-first-serve basis while any requirement that cannot be satisfied immediately either at the bases or
作者: fastness    時(shí)間: 2025-3-22 18:58
Ali Agga,Ahmed Abbou,Moussa Labbadigap. In particular, we show how the performance evaluation capability of DRP can be substantially enhanced by some simple analytical formulas, derived as approximations from base-stock and (.) control schemes.
作者: 我的巨大    時(shí)間: 2025-3-23 00:44
Eduardo Saad-Diniz,Matheus Puppee disruption propagation. Simulation and numerical experiments are carried out to show the performance of the new method in comparison with existing ones. The method can be extended to the analysis of larger open systems, such as assembly/disassembly networks, and systems with loops.
作者: Psychogenic    時(shí)間: 2025-3-23 05:19
https://doi.org/10.1007/978-3-031-04289-8 is usually an intractable dynamic program, very efficient algorithms exist to solve the fluid problem from a given initial buffer state. Fluid solutions are presented for a number of examples, some of them new.
作者: 紅腫    時(shí)間: 2025-3-23 06:38

作者: Congregate    時(shí)間: 2025-3-23 13:20
Cocou Marius Mensah,Tja?a Ivancshipments is required. Further increase of FGB leads to highly diminishing return. Also, it is shown that a ramp, rather than an inverted bowl, of machine efficiency allocation leads to optimization of DTP.
作者: 不足的東西    時(shí)間: 2025-3-23 15:25
The Right to Education in a Digital Eraabsence of known optimal solutions for larger dimensions and therefore of a testing benchmark, fine-tuning may be required. This could be achieved by incorporating dynamic parameters in the place of the static ones.
作者: 重力    時(shí)間: 2025-3-23 20:30

作者: Chagrin    時(shí)間: 2025-3-24 01:35

作者: Debate    時(shí)間: 2025-3-24 02:44
Designing Manufacturing Cells Using a Tabu Search Approach,absence of known optimal solutions for larger dimensions and therefore of a testing benchmark, fine-tuning may be required. This could be achieved by incorporating dynamic parameters in the place of the static ones.
作者: Dna262    時(shí)間: 2025-3-24 09:13
State-Space Modeling and Analysis of Pull-Controlled Production Systems, in detail. The state space models of unreliable automated production lines controlled by the kanban, constant WIP, Control Point Policy, Base Stock, and hybrids of these policies are generated and analysed.
作者: 是他笨    時(shí)間: 2025-3-24 12:59
Book 2003e production systems) and explicitly treat the stochastic nature of failures, operation times, demand, and other important events...Analysis and Modeling of Manufacturing Systems. will be of interest to readers with a strong background in operations research, including researchers and mathematically sophisticated practitioners. .
作者: 字謎游戲    時(shí)間: 2025-3-24 18:37

作者: llibretto    時(shí)間: 2025-3-24 21:18

作者: patriot    時(shí)間: 2025-3-25 02:20

作者: sundowning    時(shí)間: 2025-3-25 03:32

作者: conscribe    時(shí)間: 2025-3-25 07:42
Law, Governance and Technology Seriesting the supply chain lead time, or the order-to-delivery time is an important exercise. In this paper, we present stochastic network models for computing the average lead times of make-to-order supply chains. In particular, we illustrate the use of static probabilistic and generalized queueing networks for computing the lead times.
作者: Adenocarcinoma    時(shí)間: 2025-3-25 11:51
Analysis of Two-Valve Fluid-Flow Systems with General Repair Times,. The Markov chain has both continuous and discrete states. We have constructed a system of linear equations for the boundary states and a set of differential equations for the interior states, that are solved using the eigenvalue method. We have also investigated the impact of down time variability on the system performance metrics.
作者: 串通    時(shí)間: 2025-3-25 17:37
Stochastic Lead Time Models for Supply Chain Networks,ting the supply chain lead time, or the order-to-delivery time is an important exercise. In this paper, we present stochastic network models for computing the average lead times of make-to-order supply chains. In particular, we illustrate the use of static probabilistic and generalized queueing networks for computing the lead times.
作者: Esophagitis    時(shí)間: 2025-3-25 20:33
Process Adjustment for Assemblies,esses producing components for assembly. In the single process case, sufficient conditions are given for the optimal policy to have an upper and lower control limit form. In the two process case, we compare separate and combined policies and give an example where appreciable savings can be realized from a combined policy.
作者: 朋黨派系    時(shí)間: 2025-3-26 03:40
Analysis of Automated Flow Line Systems with Repair Crew Interference,een the production and the repair system. The suggested model and solution approach are particularly helpful in the initial design phase as well as during a redesign process in order to evaluate alternative configurations of the planned production and repair system.
作者: Meander    時(shí)間: 2025-3-26 06:38

作者: 抵消    時(shí)間: 2025-3-26 08:41

作者: Salivary-Gland    時(shí)間: 2025-3-26 14:28

作者: 吞噬    時(shí)間: 2025-3-26 20:10
https://doi.org/10.1007/978-3-031-51067-0eady-state performance measures, like the probability of immediately satisfying a demand, the average number of backordered demands, the average number of finished products, etc. It can be applied for systems assembling any number of components and containing any number of stages in series after the assembly operation.
作者: 清醒    時(shí)間: 2025-3-26 21:54
Exact Analysis of a Continuous Material Merge System with Limited Buffer Capacity and Three Stationended to be used as a building block of decomposition methods for the analysis of flow lines with non-linear flow of material that may, for example, be due to rework loops in flow lines with quality inspections.
作者: OFF    時(shí)間: 2025-3-27 03:56
Performance Evaluation of Production Lines with Random Processing Times, Multiple Failure Modes and by the proposed method over existing techniques are discussed and quantified. The method has been derived to be used as a building block within the development of a new set of decomposition equations for the analysis of larger systems, such long transfer lines and assembly/disassembly systems.
作者: 愉快嗎    時(shí)間: 2025-3-27 09:12

作者: bronchodilator    時(shí)間: 2025-3-27 10:08
https://doi.org/10.1007/978-3-031-29857-8ntral location. Each repair facility may be considered to be a job shop and is modeled as a (limited capacity) open queuing network, while any transport from the central facility to the bases (and vice versa) is modeled as an ample server. At all bases as well as at the central repair facility, read
作者: Mercantile    時(shí)間: 2025-3-27 14:25
Ali Agga,Ahmed Abbou,Moussa Labbadilied to complex distribution networks with thousands of unique stock-keeping units and hundreds of stocking locations. It allows for non-stationary (e.g. seasonal) demand patterns and a wide variety of user-specified inventory control rules including all standard inventory policies such as (.) and f
作者: 同時(shí)發(fā)生    時(shí)間: 2025-3-27 18:00

作者: Chromatic    時(shí)間: 2025-3-28 00:07

作者: 光明正大    時(shí)間: 2025-3-28 04:47
Soufiane Gaizen,Ouafia Fadi,Ahmed Abbounamic governing the arms belong to piecewise deterministic random evolutions. We then use this class of model to discuss a simple version of the scheduling problem of a flexible manufacturing resource, with limited capacity, operating in a random environment.
作者: 輕浮思想    時(shí)間: 2025-3-28 09:07
The Right to Education in a Digital Eraction is decided before sales and at the end of the selling period, the products are sold at clearance prices and the optimum production level is calculated using the knowledge of experts. The effectiveness and convenience of the method is described with a numerical example.
作者: Junction    時(shí)間: 2025-3-28 11:40
Cocou Marius Mensah,Tja?a Ivanc performance measures of a planned production system like throughput time, production rate, work in process etc. are often estimated inaccurately. The paper presents an analytical approach for performance evaluation of an automated flow line system (AFLS) which takes into account the dependency betw
作者: DEVIL    時(shí)間: 2025-3-28 18:32

作者: Mortar    時(shí)間: 2025-3-28 22:07
Eduardo Saad-Diniz,Matheus Puppe and finite buffer capacity. The key feature of the proposed method is the capability to model machines subject to different types of failures, each one characterized by exponentially distributed time to failure and time to repair. This feature, being the method based on the approximation of the beh
作者: REIGN    時(shí)間: 2025-3-29 01:30

作者: 內(nèi)行    時(shí)間: 2025-3-29 05:49
https://doi.org/10.1007/978-3-031-51067-0pair times. We have developed a continuous time Markov Chain approach to study the steady-state behavior of the valves and the material in the storage. The Markov chain has both continuous and discrete states. We have constructed a system of linear equations for the boundary states and a set of diff
作者: CHAFE    時(shí)間: 2025-3-29 09:51
Law, Governance and Technology Series several companies such as suppliers, manufacturers, distributors and retailers with the aim of producing and selling customer desired products. Computing the supply chain lead time, or the order-to-delivery time is an important exercise. In this paper, we present stochastic network models for compu
作者: 軍火    時(shí)間: 2025-3-29 13:45

作者: NOVA    時(shí)間: 2025-3-29 18:48

作者: explicit    時(shí)間: 2025-3-29 21:42

作者: 合同    時(shí)間: 2025-3-30 00:14

作者: RAG    時(shí)間: 2025-3-30 05:19

作者: agitate    時(shí)間: 2025-3-30 10:33

作者: galley    時(shí)間: 2025-3-30 14:22
The Right to Education in a Digital Eraction is decided before sales and at the end of the selling period, the products are sold at clearance prices and the optimum production level is calculated using the knowledge of experts. The effectiveness and convenience of the method is described with a numerical example.
作者: 博識(shí)    時(shí)間: 2025-3-30 20:17
Optimal Scheduling for Piecewise Deterministic Multi-Armed Bandit Problem,namic governing the arms belong to piecewise deterministic random evolutions. We then use this class of model to discuss a simple version of the scheduling problem of a flexible manufacturing resource, with limited capacity, operating in a random environment.
作者: squander    時(shí)間: 2025-3-30 22:51
Production Planning for Short Life-Cycle Products in Consideration of Clearance Sale,ction is decided before sales and at the end of the selling period, the products are sold at clearance prices and the optimum production level is calculated using the knowledge of experts. The effectiveness and convenience of the method is described with a numerical example.
作者: Bother    時(shí)間: 2025-3-31 03:42

作者: 鄙視讀作    時(shí)間: 2025-3-31 06:24
978-1-4613-5354-6Springer Science+Business Media New York 2003
作者: 生氣地    時(shí)間: 2025-3-31 13:04
International Series in Operations Research & Management Sciencehttp://image.papertrans.cn/a/image/156234.jpg
作者: FOLLY    時(shí)間: 2025-3-31 15:08
Capacitated Two-Echelon Inventory Models for Repairable Item Systems,ntral location. Each repair facility may be considered to be a job shop and is modeled as a (limited capacity) open queuing network, while any transport from the central facility to the bases (and vice versa) is modeled as an ample server. At all bases as well as at the central repair facility, read
作者: llibretto    時(shí)間: 2025-3-31 18:58
Distribution Resource Planning Systems: A Critique and Enhancement,lied to complex distribution networks with thousands of unique stock-keeping units and hundreds of stocking locations. It allows for non-stationary (e.g. seasonal) demand patterns and a wide variety of user-specified inventory control rules including all standard inventory policies such as (.) and f
作者: 故意    時(shí)間: 2025-4-1 00:13
Process Adjustment for Assemblies, formulate a stochastic dynamic program to find the optimal adjustment policy when the adjustment outcome is uncertain. The optimal policy minimizes the sum of adjustment cost during pre-production and quality cost during production. The formulation is developed for a single process and for two proc




歡迎光臨 派博傳思國(guó)際中心 (http://pjsxioz.cn/) Powered by Discuz! X3.5
岳阳县| 玛沁县| 新丰县| 哈尔滨市| 临漳县| 民勤县| 永修县| 河北区| 阜阳市| 大荔县| 库尔勒市| 大名县| 吉隆县| 呼伦贝尔市| 左贡县| 镇康县| 涟源市| 福贡县| 巨鹿县| 洱源县| 屏边| 龙川县| 陆良县| 紫金县| 泽州县| 永济市| 龙川县| 诸暨市| 滨海县| 临猗县| 马关县| 松潘县| 宽甸| 龙游县| 五峰| 库尔勒市| 济南市| 临泉县| 赤壁市| 华宁县| 泌阳县|