派博傳思國(guó)際中心

標(biāo)題: Titlebook: Advanced Models for Project Management; L. Valadares Tavares Book 1999 Springer Science+Business Media New York 1999 Simulation.complexity [打印本頁(yè)]

作者: 惡夢(mèng)    時(shí)間: 2025-3-21 18:39
書(shū)目名稱Advanced Models for Project Management影響因子(影響力)




書(shū)目名稱Advanced Models for Project Management影響因子(影響力)學(xué)科排名




書(shū)目名稱Advanced Models for Project Management網(wǎng)絡(luò)公開(kāi)度




書(shū)目名稱Advanced Models for Project Management網(wǎng)絡(luò)公開(kāi)度學(xué)科排名




書(shū)目名稱Advanced Models for Project Management被引頻次




書(shū)目名稱Advanced Models for Project Management被引頻次學(xué)科排名




書(shū)目名稱Advanced Models for Project Management年度引用




書(shū)目名稱Advanced Models for Project Management年度引用學(xué)科排名




書(shū)目名稱Advanced Models for Project Management讀者反饋




書(shū)目名稱Advanced Models for Project Management讀者反饋學(xué)科排名





作者: BAIL    時(shí)間: 2025-3-21 22:26
0884-8289 a high number of analytical and numerical results, but it seems that the main model is still the same: the concept of project network. This concept has come to represent the two major features underlying the notion of a project: the sequential and the competitive nature of its components, the proje
作者: 爭(zhēng)吵加    時(shí)間: 2025-3-22 03:32
Front Mattere kennen und nutzen.Dieser Leitfaden für eine gelungene Selbstdarstellung bietet neben praktischen Ratschl?gen unterhaltsame Ausflüge in wissenschaftliche Forschungsfelder. Studien belegen schon lange, dass Outfit und Auftreten ma?geblicher über Erfolg oder Misserfolg entscheiden als die reine Leist
作者: evasive    時(shí)間: 2025-3-22 07:03
Basic Models for Project Management,es concerning physiology of the pupillomotor system itself, pupillary activity has become an important tool in sensory physiology (Cartevette and Cole, 1962; E. ijkmann and Vendrile, 1963), neurological diagnosis and research (Stanten and Stark, 1960; Stark and Cornsweet, 1958), pharmacology (Carlso
作者: GLADE    時(shí)間: 2025-3-22 10:25

作者: 勤勉    時(shí)間: 2025-3-22 16:47
Morphology and Simulation of Project Networks,modern electronic technology improved recording and evaluation techniques (the measurement of pupil diameter and pupil reactions) gained increased importance in clinical psychophysiological diagnostics. In 1902, Dupont, and in 1910, Weiler, tried to measure the pupil diameter by means of a scale. Fo
作者: 縱欲    時(shí)間: 2025-3-22 17:31
Duration of Projects,ging them within reach of the smaller business. The extension across the country of computer service bureaux has enabled businesses which are too small to employ a computer fulltime, to employ one part-time by hiring time on service bureau machines. The economic use of computers is also facilitated
作者: maroon    時(shí)間: 2025-3-22 21:40

作者: 擁護(hù)    時(shí)間: 2025-3-23 04:07

作者: 小卷發(fā)    時(shí)間: 2025-3-23 08:49
https://doi.org/10.1007/978-1-4419-8626-9Simulation; complexity; decision theory; linear optimization; modeling; networks; optimization; scheduling
作者: 流眼淚    時(shí)間: 2025-3-23 11:55
978-1-4613-4649-4Springer Science+Business Media New York 1999
作者: Arroyo    時(shí)間: 2025-3-23 17:17
Advanced Models for Project Management978-1-4419-8626-9Series ISSN 0884-8289 Series E-ISSN 2214-7934
作者: peptic-ulcer    時(shí)間: 2025-3-23 21:55

作者: 前兆    時(shí)間: 2025-3-23 22:30

作者: Fester    時(shí)間: 2025-3-24 06:25

作者: Nefarious    時(shí)間: 2025-3-24 08:15
https://doi.org/10.1007/978-1-59745-328-8So far, project networks have been studied in terms of:.However, most project managers rely heavily on their assessment of the so-called “type” of network which is really based on its “shape” or morphology given a representation systems.
作者: Blazon    時(shí)間: 2025-3-24 13:03
Hasan H. Otu,Towia A. LibermannThe study of the duration of a project under uncertainty conditions is no doubt responsible for a large fraction of the developments in Project Management.
作者: 脆弱帶來(lái)    時(shí)間: 2025-3-24 16:56
https://doi.org/10.1007/978-94-011-4810-8The problem of scheduling is a basic and central topic of Project Management. This problem concerns, basically, the selection of the . and the . (types, levels, nodes, etc.) needed to implement each activity of the project.
作者: corpuscle    時(shí)間: 2025-3-24 21:05
https://doi.org/10.1007/978-94-011-4810-8The . of projects is a very important part of management because the number of alternative candidates is usually much higher than the number of selected projects and because even after selecting a project, there is a wide range of optional alternatives.
作者: 變白    時(shí)間: 2025-3-25 01:44

作者: Kindle    時(shí)間: 2025-3-25 04:19
International Series in Operations Research & Management Sciencehttp://image.papertrans.cn/a/image/145996.jpg
作者: 遍及    時(shí)間: 2025-3-25 09:27
Front MatterSie erfahren, wie Sie vom ersten Moment an besser wahrgenommen werden und in unterschiedlichen Alltags und Business-Situationen mehr Wirkung ausstrahlen – übrigens auch bei Videokonferenzen auf dem Bildschirm. Die 2. Auflage wurde überarbeitet und um ein Kapitel zur neuen Lockerheit erg?nzt..978-3-658-21887-4
作者: 火光在搖曳    時(shí)間: 2025-3-25 12:09
Basic Models for Project Management,been gathered. The ability to quantitatively control certain inputs encourages servoanalytic approaches adding to the richness of material on this Organ (Stark, 1968). However, this fecundity also presents special problems; the wealth of published data often appears confusing and contradictory, and has occasionally led to heated controversy.
作者: 宿醉    時(shí)間: 2025-3-25 16:02

作者: 小臼    時(shí)間: 2025-3-25 23:34
Book 1999ce a wide range of realistic representation of projects. B. the stochastic study of the features of projects such as the duration and cost of their activities is carried out by several analytical and numerical models, allowing experimental and forecasting analyses. C. the allocation of resources can
作者: mastopexy    時(shí)間: 2025-3-26 02:41

作者: Catheter    時(shí)間: 2025-3-26 06:28
The Assessment and Evaluation of Projects,s of supplier and buyer are in conflict, at any rate in the short term. The need then is to negotiate a solution which is so far as possible mutually satisfactory, without losing either ‘cordiality’ or ‘integrity’.
作者: 座右銘    時(shí)間: 2025-3-26 12:04
0884-8289 f their activities is carried out by several analytical and numerical models, allowing experimental and forecasting analyses. C. the allocation of resources can978-1-4613-4649-4978-1-4419-8626-9Series ISSN 0884-8289 Series E-ISSN 2214-7934
作者: 一夫一妻制    時(shí)間: 2025-3-26 14:55
Structural Modelling of Projects Networks,he für die Entstehung dieser ist die erschwerte Konvergenz verantwortlich zu machen, clic bedingt ist durch gr??eren Abstand der Augendrehpunkte — das ist die Basallinie —, stark divergierende Orbitalachsen und Kleinheit des Winkels ..
作者: 恩惠    時(shí)間: 2025-3-26 19:37

作者: flammable    時(shí)間: 2025-3-27 00:59
7樓
作者: 凝乳    時(shí)間: 2025-3-27 04:11
7樓
作者: RUPT    時(shí)間: 2025-3-27 06:05
7樓
作者: 吸氣    時(shí)間: 2025-3-27 11:33
7樓
作者: brachial-plexus    時(shí)間: 2025-3-27 15:40
8樓
作者: 創(chuàng)作    時(shí)間: 2025-3-27 21:40
8樓
作者: 手勢(shì)    時(shí)間: 2025-3-27 22:33
8樓
作者: Vulnerable    時(shí)間: 2025-3-28 03:38
8樓
作者: dialect    時(shí)間: 2025-3-28 10:12
9樓
作者: 借喻    時(shí)間: 2025-3-28 10:33
9樓
作者: 確定    時(shí)間: 2025-3-28 16:35
9樓
作者: 支架    時(shí)間: 2025-3-28 21:47
10樓
作者: Callus    時(shí)間: 2025-3-29 00:26
10樓
作者: 你敢命令    時(shí)間: 2025-3-29 04:43
10樓
作者: 等級(jí)的上升    時(shí)間: 2025-3-29 10:52
10樓




歡迎光臨 派博傳思國(guó)際中心 (http://pjsxioz.cn/) Powered by Discuz! X3.5
富宁县| 象州县| 新密市| 湖州市| 凯里市| 岫岩| 平舆县| 临朐县| 湖北省| 礼泉县| 万安县| 织金县| 石家庄市| 丹巴县| 临海市| 舒城县| 达孜县| 五台县| 吉水县| 克拉玛依市| 出国| 上犹县| 汉阴县| 江陵县| 巧家县| 屏边| 克什克腾旗| 南川市| 若羌县| 会宁县| 海兴县| 榆树市| 清徐县| 易门县| 墨江| 天柱县| 南昌县| 扬州市| 忻州市| 衡东县| 苍南县|